Future steam and purified water supply in the chemical park
Future Steam and Purified Water Supply of the Chemical Facilities Knapsack-Hürth – Concept Study
Concept Study for replacing the previous supply by Goldenberg lignite-fired power plant
Task:
- Analysis of different variants for the future supply with process steam (ca. 60 – 110 t/h at 16 bar and 350 °C)
- Conceptual design of a shell boiler plant (5x 35 t/h)
- Conceptual design of a purified water plant (3x 120 m³/h)
Project facts
Purified water plant | approx. 300 m³/h |
Live steam parameters | approx. 60 – 110 t/h at 16 bar and 350 °C |
Customer | YNCORIS GmbH & Co. KG (formerly InfraServ Knapsack) |
IQS performance period | 05/2020 – 09/2020 |