    Future steam and purified water supply in the chemical park

    Future Steam and Purified Water Supply of the Chemical Facilities Knapsack-Hürth – Concept Study

    Concept Study for replacing the previous supply by Goldenberg lignite-fired power plant

    Task:

    • Analysis of different variants for the future supply with process steam (ca. 60 – 110 t/h at 16 bar and 350 °C)
    • Conceptual design of a shell boiler plant (5x 35 t/h)
    • Conceptual design of a purified water plant (3x 120 m³/h)

    Project facts

    Purified water plant approx. 300 m³/h
    Live steam parameters approx. 60 – 110 t/h at 16 bar and 350 °C
    Customer YNCORIS GmbH & Co. KG (formerly InfraServ Knapsack)
    IQS performance period 05/2020 – 09/2020